Manchester Pacific Gateway Navy Administration Building

Manchester Pacific Gateway Navy Administration Building

Mechanical and plumbing engineering services for the Navy Administration Building, which is part of the larger $1.5 billion Manchester Pacific Gateway development along the harbor in downtown San Diego, CA. The building is 17 stories high and approximately 372,000 SF, which consists of office areas, administrative and emergency facilities for the United States Navy.

Mechanical systems include a high efficiency air cooled chiller system coupled with floor by floor mounted VAV air handlers. This building also includes a high efficiency boiler plant and all specialty mechanical systems for sensitive Navy operations.

Plumbing systems include sanitary waste and vent to all plumbing fixtures. Domestic cold water is provided via booster pump located
at the garage level. Domestic hot water is provided to serve the plumbing fixtures. A circulation pump is provided to maintain hot water temperature in the distribution system. All storm water from the entire project site is gathered and processed to central storm water filtration system before connecting to municipal storm water system.

Sustainable features include high-efficiency, low-flow, water conserving plumbing fixtures are provided throughout the building.

$165,000,000
372,000 SF
ENR California’s Best Projects “Award of Merit” 2021, Government/Public Building category
2022 SDGBC Sustainable Neighborhood Development / District Awardy
Targeting LEED Gold