Legoland Hotel 2

Legoland Hotel 2

The Castle Hotel, located in the Legoland theme park, is three-stories and includes 250 themed rooms. The new hotel includes upgraded rooms with more detailed and colorful decor tied to the castle experience. The unique design of the hotel not only extends the experience and feel of the theme park itself but also makes it more convenient for families to stay more than just one day.

The mechanical systems serving the guestrooms consists of multiple variable refrigerant flow (VRF) multi-unit split air conditioning systems. The registration, lounge, kitchen, restaurant, offices, fitness and meeting room spaces are heated and cooled using high-efficiency rooftop packaged gas/electric units (or split system heat pumps for small zones). Guestroom exhaust consists of rooftop central exhaust fans monitored and controlled through the building EMS.

Plumbing systems include sanitary waste vent and domestic water systems serving the hotel. All plumbing fixtures are high-efficiency, low-flow water consumption. All domestic water serving the building is softened via a brine based water softener. Domestic hot water is generated via high-efficiency, natural gas fired water heaters and storage tanks. A hot water circulation system is provided to maintain hot water temperature throughout the hotel. The kitchen area is provided with a grease waste system, including a below-ground grease interceptor and sample tank. Building roof drainage is provided via primary and overflow scupper drains. The primary downspout drains route to underground storm drainage system. The overflow downspout spills to grade. The building natural gas is served by the site-high pressure (25 PSI) natural gas system. The buildings main pressure is provided with a main pressure regulator to reduce to 5 PSI. Each branch serving equipment is provided with a branch pressure regulator set at 11” water column.

$20,000,000
145,000 SF